Report: Nuclear material came off unused fuel assembly removed from Fukushima Unit 4 pool — Cobalt-60 at 1,400,000,000 Bq/kg — Debris “felt like grit” (PHOTOS)

Published: March 26th, 2013 at 9:30 pm ET
By
Email Article Email Article
6 comments


March 7, 2013 Tepco document regarding testing of the fuel assemblies removed from the Unit 4 fuel pool with summary translation by Fukushima Diary:

According to Tepco, significantly high level of Co-60 was measured from the piece of debris taken from SFP4.

They measured 1,400,000,000 Bq/Kg of Co-60 [...]

It was taken when they washed the new fuel assembly [...]

Tepco states it felt like grit. Some parts were broken into sand, which couldn’t be collected. [...]

Full report here

See also: Gundersen on Gamma Rays: "Implies rubble was activated by neutrons, or that activation products like Cobalt-60 are in rubble -- Interesting"

Published: March 26th, 2013 at 9:30 pm ET
By
Email Article Email Article
6 comments

Related Posts

  1. Watch: Underwater close-up of fuel assembly pulled from rack at Fukushima Unit 4 — Debris seen floating inside pool (VIDEOS) November 23, 2013
  2. Damaged fuel rods are cracked and leaking radioactive gases in Fukushima Unit 4 pool; Wire appears trapped in racks — Another assembly bent when “mishandled during a transfer” November 14, 2013
  3. Damaged Spent Fuel Pool No. 4 had 204 unused fuel rods inserted before quake + Scientists say another 9.0 megaquake may hit at year’s end = “Fukushima is still on the edge” October 29, 2011
  4. Tepco to remove fresh fuel from No. 4 pool this summer — “Hoping to determine how damaged unused assemblies are” May 28, 2012
  5. Photos: ‘Protection’ to be installed over No. 3 fuel pool at Fukushima — Concern over more debris falling in February 6, 2013

6 comments to Report: Nuclear material came off unused fuel assembly removed from Fukushima Unit 4 pool — Cobalt-60 at 1,400,000,000 Bq/kg — Debris “felt like grit” (PHOTOS)

You must be logged in to post a comment.